Solutions

Cable car Gate project (Genova)

Cable Car (GATE project)

Type of solution: Adding a mode
Node: Genova
Link or contact: http://www.genovameravigliosa.com/sites/default/files/GATE_.pdf


GATE is a project aiming to realize the intermodal connection from the international airport “Cristoforo Colombo”, located in the west side of the city of Genova, to train and public transport networks. GATE project consists of two distinct subprojects: the new Erzelli / Airport railway stop, located on the Genova Ventimiglia line between Sestri Ponente and Cornigliano stations, and the plant of a cableway link between the new stop and the airport passenger terminal. The solution chosen by the technicians for the cable-link system is that of a gondola with a capacity of 600 – 700 people per hour. A stop of the cabins at the station is foreseen, to allow easy access to the transport system.
A further development of GATE project relates to the prosecution of the cableway to Erzelli area, a hill overlooking the city where an important high-technology park, GREAT CAMPUS, is rapidly growing. Erzelli is located on a hill, physically very close the railway and the airport but difficult to be reached due to size and slope of access roads: the realisation of the cableway seems the best solution to ensure an efficient mass transport system for employees, students and citizens, and at the same time provides a very rapid connection between the Erzelli park and the airport.

Impact Overview


Impact criteria / Questions / Answer
Questions
Answer
A Accessibility
Q:The solution impacts the chosen modality of the flows
A:1
Q:The solution impacts the route of the flows
A:1
Q:The solution impacts the volume of the flows
A:0
Q:The solution impacts the timing of the flows
A:1
Q:The solution impacts the available infrastructure capacity
A:1
B Safety
Q:The solution impacts the number of pedestrian casualties
A:0
Q:The solution impacts the number of cyclist casualties
A:0
Q:The solution impacts the number of motorised vehicle casualties
A:1
Q:The solution impacts the external safety of dangerous goods transport
A:0
Q:The solution impacts the external safety of warehousing operations
A:0
C Economy
Q:The solution impacts the attractivity of the local scale (city) of the Node for investments (value capturing)
A:1
Q:The solution impacts the attractivity of the FUA from logisctics perspective of the Node for investments (value capturing)
A:0
Q:The solution impacts the price of living in urban areas (socio economic)
A:0
Q:The solution impacts synergies with other sectors
A:0
Q:The solution impacts the GDP
A:0
D Vitality
Q:The solution impacts the air quality
A:1
Q:The solution impacts the visual quality of the environment
A:0
Q:The solution impacts the level of noise pollution
A:1
Q:The solution impacts the ease of moving in the city for citizens
A:2
Q:The solution impacts the quality of living
A:0
E Connectivity
Q:The solution impacts the connection between the city and the functional urban area from a mobility perspective
A:1
Q:The solution impacts the connection between the city and the functional area from a logistics perspective
A:0
Q:The solution impacts the connection with other Nodes on the Corridor
A:0
Q:The solution impacts the connection with other TEN-T Corridors
A:0
Q:The solution impacts the connection with the comprehensive network
A:0