Theemsweg track for railfreight (Rotterdam)

Theemsweg Trace for railfreight

Type of solution: Optimizing infrastructure
Node: Rotterdam
Link or contact: https://www.portofrotterdam.com/en/our-port/port-development/from-calandbrug-to-theemswegtrace


The Action is part of a Global Project aiming to remove the bottleneck in the rail freight access of main port Rotterdam connecting three core network corridors (Rhine Alpine, North Sea-Mediterranean and North Sea-Baltic), by upgrading the infrastructural node at Caland Bridge and rerouting rail freight transport via an alternative route: The Theemsweg railway section.The Action’s main objective is to carry out the civil infrastructure works to create the alternative route to avoid the Caland Bridge, consisting of the double track Theemsweg railway section of an approximate length of 4.5 km.

Impact Overview


Impact criteria / Questions / Answer
Questions
Answer
A Accessibility
Q:The solution impacts the chosen modality of the flows
A:1
Q:The solution impacts the route of the flows
A:1
Q:The solution impacts the volume of the flows
A:1
Q:The solution impacts the timing of the flows
A:1
Q:The solution impacts the available infrastructure capacity
A:1
B Safety
Q:The solution impacts the number of pedestrian casualties
A:0
Q:The solution impacts the number of cyclist casualties
A:0
Q:The solution impacts the number of motorised vehicle casualties
A:0
Q:The solution impacts the external safety of dangerous goods transport
A:0
Q:The solution impacts the external safety of warehousing operations
A:0
C Economy
Q:The solution impacts the attractivity of the local scale (city) of the Node for investments (value capturing)
A:0
Q:The solution impacts the attractivity of the FUA from logisctics perspective of the Node for investments (value capturing)
A:0
Q:The solution impacts the price of living in urban areas (socio economic)
A:0
Q:The solution impacts synergies with other sectors
A:0
Q:The solution impacts the GDP
A:0
D Vitality
Q:The solution impacts the air quality
A:1
Q:The solution impacts the noise levels
A:-1
Q:The solution impacts health of citizens
A:0
Q:The solution impacts the ease of moving in the city for citizens
A:1
Q:The solution impacts the quality of living
A:0
E Connectivity
Q:The solution impacts the connection between the city and the functional urban area from a mobility perspective
A:0
Q:The solution impacts the connection between the city and the functional area from a logistics perspective
A:2
Q:The solution impacts the connection with other Nodes on the Corridor
A:2
Q:The solution impacts the connection with other TEN-T Corridors
A:2
Q:The solution impacts the connection with the comprehensive network
A:2